Cemetry Riensberg

Implementation of a water monitoring program in the form of regular measurements, maintenance and the initiation of improvement measures.
Natural Swimming Pool Weende

The water purification in Weende is operated in a biological manner with the help of sprinkled and swamped ground filters, which are integrated into the open space design of the park.
Natural Swimming Pool Herrenberg

The bath is a combination of chlorinated pool according to the DIN 19643 standard and a bath with biological water treatment.
Outdoor Pool Tostedt

The new outdoor pool was designed as a combi-pool consisting of a natural pool (biological water purification) with a swimmer’s pool (chemical water purification).
Outdoor Pool Hänigsen

In 2016, the outdoor pool in Hänigsen was awarded the „Public Value Award for the Public Pool 2016“ by the „German Association for the Bathing Industry“.
Bois de Vincennes Paris

In the traditional park Bois de Vincennes North Paris, Polyplan-Kreikenbaum was responsible for the design planning of a seasonal bath in the listed park lake.
Sailing harbor Osterdeich

Near-natural redesign of the shore area and staging of the existing vegetation in the course of a necessary shore protection at the Segelhafen.
Lüttnsee Tornesch

Lake Lüttensee represents the heart of the new urban district development. In addition to local recreation, a far-sighted, holistic drainage concept was to be created.
Flood Protection Object Protection Plus: Weserstadion Bremen

In collaboration with hydraulic engineers, planning was carried out for flood protection of the Bremen Weser Stadium up to +6.50 m NN.
Natural Swimming Pool Ennigerloh

The Ennigerloh outdoor pool was converted into a pool with biological water purification; the existing pool and building fabric were largely retained.