Outdoor Pool Tostedt

The new outdoor pool was designed as a combi-pool consisting of a natural pool (biological water purification) with a swimmer’s pool (chemical water purification).

Outdoor Pool Hänigsen

In 2016, the outdoor pool in Hänigsen was awarded the „Public Value Award for the Public Pool 2016“ by the „German Association for the Bathing Industry“.

Bois de Vincennes Paris

In the traditional park Bois de Vincennes North Paris, Polyplan-Kreikenbaum was responsible for the design planning of a seasonal bath in the listed park lake.

Balneon

New construction of a natural outdoor pool and a sauna bath in combination with an attached indoor pool with fitness center.

Natural Bathing Lake Schladen

Due to the algae blooms appearing in summer, a new filter concept based on biological methods had to be developed for the Schladen bathing lake.

Achterdieksee

In the Achtern Diek bathing lake (12 ha), there were severe algae blooms, especially in the late summer, which impaired bathing use.

Dong Feng Lake

Polyplan-Kreikenbaum Gruppe GmbH was responsible for developing measures to improve the quality of Dong Feng Lake.

Sailing harbor Osterdeich

Near-natural redesign of the shore area and staging of the existing vegetation in the course of a necessary shore protection at the Segelhafen.

Lüttnsee Tornesch

Lake Lüttensee represents the heart of the new urban district development. In addition to local recreation, a far-sighted, holistic drainage concept was to be created.