Cemetry Riensberg

Implementation of a water monitoring program in the form of regular measurements, maintenance and the initiation of improvement measures.

Cemetry Osterholz

Implementation of various rehabilitation and restoration measures from 1998 to 2018 at the Osterholz Cemetery in Bremen.

Bois de Vincennes Paris

In the traditional park Bois de Vincennes North Paris, Polyplan-Kreikenbaum was responsible for the design planning of a seasonal bath in the listed park lake.

Natural Bathing Lake Schladen

Due to the algae blooms appearing in summer, a new filter concept based on biological methods had to be developed for the Schladen bathing lake.

Achterdieksee

In the Achtern Diek bathing lake (12 ha), there were severe algae blooms, especially in the late summer, which impaired bathing use.

Dong Feng Lake

Polyplan-Kreikenbaum Gruppe GmbH was responsible for developing measures to improve the quality of Dong Feng Lake.

Auenweiher in Fulda

A sustainable attractiveness of the lakes was planned with regard to their bathing use and open space design.

State Horticulture Show Ingolstadt

The Polyplan-Kreikenbaum group and Wasserwerkstatt had the task to design a water treatment system , its hydraulic interaction and the pump control.