Waterark Świętochłowice

In Swietochlowice near Katowice, in cooperation with local architects, we planned and implemented the water treatment technology for the first public natural swimming pool in Poland.

Swimming Pool Gothenburg

In Gothenburg, we planned a floating bath with biological water treatment together with Raumlabor Berlin.

Parkbad Kriens

The refurbishment of the bath was planned as ARGE Planungsteam Wegmüller-Schacher / Wasserwerkstatt Bamberg and Polyplan-Kreikenbaum.

Natural Swimming Pool Bingen

Refurbishment of the Bingen-Bingerbrück natural adventure pool with biological water treatment by Polyplan-Kreikenbaum Gruppe GmbH.

Natural swimming pool Tessiner Südsee

The natural bath Tessin was built as a bath with biological water treatment, according to the FLL 2011 Bath technology, PLC control and monitoring were carried out by Polyplan.

Natural Swimming Pool, Hainholz

Polyplan-Kreikenbaum was responsible for the refurbishment of the water technology in the natural swimming pool Hainholz/Hanover in this project.

Natural Swimming Pool Borden

Polyplan was responsible for the pool function, the water treatment scheme, the pump and piping design, and the microcontroller system.

Naturbad Zeven

A conventional outdoor pool has been transformed into an attractive natural pool with biological water purification and a variety of bathing attractions.