Cemetry Osterholz

Implementation of various rehabilitation and restoration measures from 1998 to 2018 at the Osterholz Cemetery in Bremen.
Sailing harbor Osterdeich

Near-natural redesign of the shore area and staging of the existing vegetation in the course of a necessary shore protection at the Segelhafen.
Flood Protection Object Protection Plus: Weserstadion Bremen

In collaboration with hydraulic engineers, planning was carried out for flood protection of the Bremen Weser Stadium up to +6.50 m NN.
Weser-promenade „Tiefer“

Upgrading of paths and a staircase, installation of exterior lighting and development of the theater ship at the Tiefer, Bremen.
Stadionbad Bremen

The bath was planned as a combined bath. This means that the non-swimmer area is treated biologically and the swimmer area with chlorine.