In collaboration with hydraulic engineers, planning was carried out for flood protection of the Bremen Weser Stadium up to +6.50 m NN.
Measures in the open spaces resulting as a green corridor around the Weser Stadium are to be seen in a unified concept with the flood protection scheme (HWS); open space planning as optimization of the constructive flood protection.