Outdoor Pool Tostedt

Client:
Samtgemeinde Tostedt
Location:
Tostedt
Execution time:
2015
Service phases:
1 - 9
Opening:
2015
Building costs:
approx. 2.9 M Euro
Planning Fees:
491,500 Euro

Preparation of a draft proposal for the renovation and redesign of the Tostedt open-air swimming pool. The new outdoor pool was designed as a combi-pool consisting of a natural pool (biological water purification) with a swimmer’s pool (chemical water purification).
The concept includes several different bathing areas as well as the open space design with both playing and recreational attractions.
The swimming areas cover all the needs of outdoor pool use and ranging from paddling pools, two non-swimmer pools with sandy beaches, two swimmer pools, a diving area, water slide pools and attractively designed water purification pools with overgrown water plants.