In this project Polyplan-Kreikenbaum developed and realized a new technology for floating pools in harbors. Bathing in the middle of Götheborg. Millennium Pool Götheborg, Frihamn
In the pilot project Courtyard "Straussvej" in the middle of Copenhagen, rainwater from the roof surfaces is collected, purified and stored. Copenhagen, Denmark 2019 to 2020 Straussvej Courtyard
In 2021, the renovation of the water park in Wennigsen was successfully implemented so that the pool could be opened in August 2021. Wennigsen am Deister 2021 Waterpark Wennigsen
In Swietochlowice near Katowice, in cooperation with local architects, we planned and implemented the water treatment technology for the first public natural swimming pool Świętochłowice, Poland 2013 to 2014 Waterark Świętochłowice
In Gothenburg, we planned a floating bath with biological water treatment together with Raumlabor Berlin. Gothenburg, Sweden 2015 Swimming Pool Gothenburg
The refurbishment of the bath was planned as ARGE Planungsteam Wegmüller-Schacher / Wasserwerkstatt Bamberg and Polyplan-Kreikenbaum. Kriens, Switzerland 2011 to 2012 Parkbad Kriens
Refurbishment of the Bingen-Bingerbrück natural adventure pool with biological water treatment by Polyplan-Kreikenbaum Gruppe GmbH. Bingen am Rhein 2008 to 2009 Natural Swimming Pool Bingen
In 2013/14, the expansion of the Lister Gracht in Hanover with biological water treatment and targeted planting was planned and implemented. Hannover 2012 to 2014 Gracht Hannover
Polyplan-Kreikenbaum was responsible for the refurbishment of the water technology in the natural swimming pool Hainholz/Hanover in this project. Hannover 2017 to 2018 Natural Swimming Pool, Hainholz
Construction of the first natural pool with biological water treatment in Ruds Vedby, Denmark. Ruds Vedby, Denmark 2013 to 2015 Natural Swimming Pool Ruds Vedby
Implementation of a water monitoring program in the form of regular measurements, maintenance and the initiation of improvement measures. Bremen 2011 Cemetry Riensberg
The water purification in Weende is operated in a biological manner with the help of sprinkled and swamped ground filters, which are integrated into Göttingen 2016 to 2018 Natural Swimming Pool Weende
The bath is a combination of chlorinated pool according to the DIN 19643 standard and a bath with biological water treatment. Herrenberg 2014 to 2015 Natural Swimming Pool Herrenberg
The new outdoor pool was designed as a combi-pool consisting of a natural pool (biological water purification) with a swimmer's pool (chemical water purification). Tostedt 2015 Outdoor Pool Tostedt
In 2016, the outdoor pool in Hänigsen was awarded the "Public Value Award for the Public Pool 2016" by the "German Association for the Hänigsen 2015 bis 2016 Outdoor Pool Hänigsen
In the traditional park Bois de Vincennes North Paris, Polyplan-Kreikenbaum was responsible for the design planning of a seasonal bath in the listed park Paris, France 2016 to 2018 Bois de Vincennes Paris
Near-natural redesign of the shore area and staging of the existing vegetation in the course of a necessary shore protection at the Segelhafen. Bremen Sailing harbor Osterdeich
Lake Lüttensee represents the heart of the new urban district development. In addition to local recreation, a far-sighted, holistic drainage concept was to be Tornesch Lüttnsee Tornesch
In collaboration with hydraulic engineers, planning was carried out for flood protection of the Bremen Weser Stadium up to +6.50 m NN. Bremen Flood Protection Object Protection Plus: Weserstadion Bremen
The Ennigerloh outdoor pool was converted into a pool with biological water purification; the existing pool and building fabric were largely retained. Ennigerloh 2019 to 2020 Natural Swimming Pool Ennigerloh
Bassum's natural swimming pool is getting on in years after its first renovation in 2006, we were authorized to plan a refurbishment and we Bassum 2018 to 2021 Stiftspark Outdoor Pool Bassum
Upgrading of paths and a staircase, installation of exterior lighting and development of the theater ship at the Tiefer, Bremen. Bremen Weser-promenade “Tiefer”
Planning and realisation of a water treatment system for the harbour bath in Aarhus (Denmark). Aarhus, Denmark 2017 to 2018 Harbour bath Aarhus
A sustainable attractiveness of the lakes was planned with regard to their bathing use and open space design. Fulda 2017 to 2022 Auenweiher in Fulda
New development and construction of a natural outdoor pool in Beelitz on the site of the old overhead water tank. Beelitz 2021- Natural Swimming Pool Beelitz
Since 2008, the Froschloch outdoor pool has been converted into a natural outdoor pool and completely rebuilt, including the buildings. Dortmund 2007 to 2008 Natural Swimming Pool Froschloch
Outdoor pool with biological water treatment and integration of the Nuhne River, which flows by, as a source of filling water. Hallenberg 2009 Natural Pool Hallenberg
The Polyplan-Kreikenbaum group and Wasserwerkstatt had the task to design a water treatment system , its hydraulic interaction and the pump control. Ingolstadt 2018 to 2019 State Horticulture Show Ingolstadt